Build it right from day one

A SCADA system is the backbone of every renewable energy asset.

In new construction, its architecture, data model, and control logic must be designed properly from the start to ensure safe operation, reliable communications, and long-term scalability.

A Stable Foundation for the Entire Lifecycle

A well-planned SCADA implementation establishes a stable foundation for the entire lifecycle of the asset by supporting commissioning, operations, cybersecurity, and future upgrades.

Common challenges in new construction

Building renewable energy assets involves complex coordination across multiple systems and stakeholders.

Multi-Vendor Integration

Integrating multiple vendors (turbines, inverters, BESS, substation, meteorological stations) into a unified platform.

IT/OT Network Design

Coordinating IT/OT network design and cybersecurity requirements early in the project.

Data Model Alignment

Ensuring the data model matches contractual, regulatory, and operational needs.

Testing Coordination

Managing FAT, SAT, and commissioning in parallel with construction activities.

Grid Compliance

Meeting grid compliance and interoperability requirements from ISOs, utilities, and owners.

Documentation Standards

Ensuring documentation, naming conventions, and testing procedures are consistent across all packages.

Ganex’s approach to SCADA

We work directly with EPCs, owners, and equipment suppliers to design a robust, scalable SCADA system. Our multidisciplinary team covers:

 

 

 

 

 

 

SCADA architecture design (network, servers, HMIs, historian, failover strategies)

Control philosophy and logic development

Integration of all plant subsystems into one secure and reliable platform

Cybersecurity planning aligned with best practices and evolving standards

Factory & Site Acceptance Testing with clear procedures and evidence tracking

Commissioning support to ensure every device communicates and performs as intended

Documentation packages that support operations, maintenance, and regulatory audits

A long-term investment

A Long-Term Investment

A well-designed SCADA at construction stage reduces operational risks, ensures data reliability, and avoids costly retrofits later. With Ganex, your asset starts its lifecycle with a modern, secure, future-proof control and monitoring platform.

Reduce Operational Risks

Ensure Data Reliability

Avoid Costly Retrofits

Ready to Design Your SCADA System?

Discover more solutions to address your questions :

Let’s connect to discuss how we can help you optimize your IT/OT infrastructure !
Contact-short-en
Scroll to Top