SCADA and Automation for Industrial Facilities

Ganex integrates and upgrades industrial SCADA systems in Canada and the United States. We also support automation and IT/OT infrastructure. Connect your equipment and give teams a shared view of production data, alarms and events.

Connected Systems for Operational Visibility

SCADA, Automation and IT/OT Solutions for Manufacturing

For example, a plant can use several generations of controllers, operator interfaces and software. Before integration, Ganex reviews these systems with your team. Together, we define the data, authorized commands and responsibilities for the project. As a result, this review connects production, maintenance and IT needs with the capabilities of your existing equipment.

Centralized Data and Alarms

Equipment-Specific Interfaces

Coordinated Intervention Planning

Accessible Event History

Four Steps for Your Industrial SCADA Project

assess-industrial-ganex

Assess Systems and Priorities

Before planning changes, review your equipment, software, communications and operating needs. As a result, the assessment helps your team define the project scope and dependencies. Together, we identify improvements to examine in more detail.

Explore site assessments

deploy without disruption ganex

Integrate and Test to an Agreed Plan

Next, define interfaces, screens, alarms and tests with your project team. During integration, Ganex coordinates the work around production constraints. Before work begins, we also agree on shutdown windows and conditions for returning equipment to service.

optimize and watch profit climb ganex

Monitor IT/OT Infrastructure

During operation, monitoring tracks the IT/OT equipment and services in your scope. For example, it can cover servers, networks and communications. Alerts and reports then help your team investigate anomalies and prepare interventions.

Explore IT/OT monitoring

scale with confidence ganex

Plan Modernization and Expansion

Prepare upgrades, equipment additions and site extensions around a documented architecture. First, review the condition and compatibility of each component. Then decide what to retain or replace based on your operating needs.

Explore SCADA retrofit services

A Coordinated Approach to Your Operations

Defined Project Scope

Establish equipment, interfaces and expected results before configuration begins.

Prepared Testing

Agree test scenarios and acceptance criteria with the teams involved.

Coordinated SCADA and Networks

Address exchanges between applications, equipment and IT/OT infrastructure within the same project.

Cybersecurity in the Project

Review access and communications in the context of the facility’s operating constraints.

Prepared Recovery

Document dependencies and restoration steps in a recovery plan for the selected systems.

Scoped Remote Monitoring

Define alerts, escalation and authorized actions for the agreed monitoring services.

For Owners, Operators and Project Teams

Asset Owners and Operators

Define monitoring, maintenance and modernization needs around installed systems.

Contractors and EPCs

Coordinate interfaces, interventions, testing and deliverables with the owner and suppliers.

Engineering Teams

Connect SCADA architecture, networks and operator requirements within a shared scope.

Let’s Discuss Your Industrial Project

Industrial SCADA and Automation Questions

What does SCADA do in a manufacturing facility?

SCADA brings together data, equipment status, alarms and histories from connected systems. Operators then use these views to follow production and issue authorized commands. Local controllers still handle the functions in their programming. Available SCADA functions depend on your interfaces and project scope.

What is the difference between a PLC, HMI and SCADA?

A programmable logic controller, or PLC, runs the equipment control logic. In contrast, a human-machine interface, or HMI, lets operators view status and use available commands. SCADA brings together supervision, alarms and data from integrated systems. These functions may overlap depending on the architecture.

Can a SCADA upgrade retain existing equipment?

Yes, when equipment condition and interfaces allow it. Before migration, an assessment identifies components to retain, adapt or replace. Your project team then defines tests and intervention windows. Some steps may require a planned shutdown, so we review the options with production managers and suppliers.

What can IT/OT monitoring cover at an industrial facility?

Monitoring can track the health of selected servers, network equipment, communications and software. Before the service starts, your team and Ganex define thresholds, notifications, reports and responsibilities. For 24/7 monitoring, we also agree on coverage and escalation procedures for your facility.

What information should we prepare for an industrial SCADA project?

First, list your controllers, HMIs, software and network equipment. Also gather available diagrams and interface details. Then identify the data, alarms and production constraints that matter to your team. Finally, include possible intervention windows so we can define priorities, testing and responsibilities together.

Planning a SCADA upgrade, equipment integration or IT/OT monitoring? Let’s review your systems, production constraints and priorities.

Contact-short-en
Scroll to Top